US Bridges

Tucker Road over Riverside Canal

Fair

Canyon County, Idaho · 1.1 N. 3.3 E. Wilder · Structure no. 000000000026956

Built
1999
26 years old
Condition
Fair
inspected October 2023
Type
Frame
Concrete
Length
30 ft
1 main span
Daily traffic
20
2023 count
Owner
Local
Other Local Agency

About this bridge

Tucker Road over Riverside Canal is a concrete frame carrying Tucker Road over Riverside Canal in Canyon County, Idaho. It was built in 1999, so it is 26 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 20 vehicles a day, roughly 5% of them trucks, projected to reach 30 by 2039. The structure is 30 ft (9.1 m) long and 32 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesTucker Road
CrossesRiverside Canal
Location1.1 N. 3.3 E. Wilder
RouteCounty Highway 0
StateIdaho
Coordinates43.69484, -116.8456
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating52 US tons
Inventory rating31 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span30 ft (9.1 m)
Deck width32 ft (9.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2023)
Projected traffic30 by 2039
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Tucker Road over Riverside Canal built?

It was built in 1999, making it 26 years old in 2025.

What condition is Tucker Road over Riverside Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Tucker Road over Riverside Canal carry?

About 20 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Tucker Road over Riverside Canal?

The structure is 30 ft (9.1 m) long with a longest span of 30 ft (9.1 m) and a deck 32 ft wide.

Who owns Tucker Road over Riverside Canal?

It is owned by the Other Local Agency.