US Bridges

Lynwood Road over High Line Canal

Fair

Canyon County, Idaho · 5.4 S. 1.6 W. Nampa · Structure no. 000000000026920

Built
1974
51 years old
Condition
Fair
inspected March 2024
Type
Tee Beam
Prestressed Concrete
Length
24 ft
1 main span
Daily traffic
100
2023 count
Owner
Local
Other Local Agency

About this bridge

Lynwood Road over High Line Canal is a prestressed concrete tee beam carrying Lynwood Road over High Line Canal in Canyon County, Idaho. It was built in 1974, so it is 51 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 150 by 2039. The structure is 24 ft (7.3 m) long and 48 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLynwood Road
CrossesHigh Line Canal
Location5.4 S. 1.6 W. Nampa
RouteCounty Highway 0
StateIdaho
Coordinates43.49969, -116.59297
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating38 US tons
Inventory rating23 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length24 ft (7.3 m)
Longest span23 ft (7 m)
Deck width48 ft (14.6 m)
Roadway width46 ft (14.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2023)
Projected traffic150 by 2039
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lynwood Road over High Line Canal built?

It was built in 1974, making it 51 years old in 2025.

What condition is Lynwood Road over High Line Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Lynwood Road over High Line Canal carry?

About 100 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Lynwood Road over High Line Canal?

The structure is 24 ft (7.3 m) long with a longest span of 23 ft (7 m) and a deck 48 ft wide.

Who owns Lynwood Road over High Line Canal?

It is owned by the Other Local Agency.