Stc 3730;RIVERSIDE over Deer Flat High Line Cnl
FairCanyon County, Idaho · 1.8 N. 3.3 E. Marsing · Structure no. 000000000019690
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected March 2023
- Type
- Frame
- Concrete
- Length
- 27 ft
- 1 main span
- Daily traffic
- 980
- 2023 count
- Owner
- Local
- Other Local Agency
About this bridge
Stc 3730;RIVERSIDE over Deer Flat High Line Cnl is a concrete frame carrying Stc 3730;RIVERSIDE over Deer Flat High Line Cnl in Canyon County, Idaho. It was built in 1986, so it is 39 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 980 vehicles a day, roughly 21% of them trucks, projected to reach 1,470 by 2042. The structure is 27 ft (8.2 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stc 3730;RIVERSIDE over Deer Flat High Line Cnl built?
It was built in 1986, making it 39 years old in 2025.
What condition is Stc 3730;RIVERSIDE over Deer Flat High Line Cnl in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Stc 3730;RIVERSIDE over Deer Flat High Line Cnl carry?
About 980 vehicles per day (2023 count), of which roughly 21% are trucks.
How long is Stc 3730;RIVERSIDE over Deer Flat High Line Cnl?
The structure is 27 ft (8.2 m) long with a longest span of 27 ft (8.2 m) and a deck 33 ft wide.
Who owns Stc 3730;RIVERSIDE over Deer Flat High Line Cnl?
It is owned by the Other Local Agency.