Sma 7166;1st ST over Meppen Canal
FairBonneville County, Idaho · In Idaho FALLS;1st Street · Structure no. 000000000021340
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected March 2024
- Type
- Frame
- Concrete
- Length
- 23 ft
- 1 main span
- Daily traffic
- 18,000
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Sma 7166;1st ST over Meppen Canal is a concrete frame carrying Sma 7166;1st ST over Meppen Canal in Bonneville County, Idaho. It was built in 1980, so it is 45 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 18,000 vehicles a day, roughly 1% of them trucks, projected to reach 27,000 by 2042. The structure is 23 ft (7 m) long and 80 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sma 7166;1st ST over Meppen Canal built?
It was built in 1980, making it 45 years old in 2025.
What condition is Sma 7166;1st ST over Meppen Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Sma 7166;1st ST over Meppen Canal carry?
About 18,000 vehicles per day (2023 count), of which roughly 1% are trucks.
How long is Sma 7166;1st ST over Meppen Canal?
The structure is 23 ft (7 m) long with a longest span of 23 ft (7 m) and a deck 80 ft wide.
Who owns Sma 7166;1st ST over Meppen Canal?
It is owned by the City or Municipal Highway Agency.