Stc 6727;75th East over Anderson Canal
FairBonneville County, Idaho · 4.0 E. 0.3 N. Ucon · Structure no. 000000000020855
- Built
- 1954
- 71 years old
- Condition
- Fair
- inspected November 2024
- Type
- Frame
- Concrete
- Length
- 22 ft
- 1 main span
- Daily traffic
- 900
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Stc 6727;75th East over Anderson Canal is a concrete frame carrying Stc 6727;75th East over Anderson Canal in Bonneville County, Idaho. It was built in 1954, so it is 71 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 900 vehicles a day, roughly 5% of them trucks, projected to reach 1,350 by 2042. The structure is 22 ft (6.7 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stc 6727;75th East over Anderson Canal built?
It was built in 1954, making it 71 years old in 2025.
What condition is Stc 6727;75th East over Anderson Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Stc 6727;75th East over Anderson Canal carry?
About 900 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Stc 6727;75th East over Anderson Canal?
The structure is 22 ft (6.7 m) long with a longest span of 22 ft (6.7 m) and a deck 28 ft wide.
Who owns Stc 6727;75th East over Anderson Canal?
It is owned by the County Highway Agency.