US Bridges

Taylor Boulevard over Taylor Drainage

FairPosted for load

Bingham County, Idaho · 27.5 N. 15.6 W. Blackfoot · Structure no. 000000000205029

Built
1958
67 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
22 ft
1 main span
Daily traffic
1,408
2021 count
Owner
Unknown

About this bridge

Taylor Boulevard over Taylor Drainage is a concrete stringer/multi-beam or girder carrying Taylor Boulevard over Taylor Drainage in Bingham County, Idaho. It was built in 1958, so it is 67 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 1,408 vehicles a day, roughly 10% of them trucks, projected to reach 1,478 by 2041. The structure is 22 ft (6.8 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTaylor Boulevard
CrossesTaylor Drainage
Location27.5 N. 15.6 W. Blackfoot
RouteCounty Highway 0
StateIdaho
Coordinates43.56457, -112.65547
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating28.5 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length22 ft (6.8 m)
Longest span20 ft (6 m)
Deck width36 ft (10.9 m)
Roadway width33 ft (10.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,408 (2021)
Projected traffic1,478 by 2041
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerNot reported
Maintained byNot reported
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Taylor Boulevard over Taylor Drainage built?

It was built in 1958, making it 67 years old in 2025.

What condition is Taylor Boulevard over Taylor Drainage in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Taylor Boulevard over Taylor Drainage carry?

About 1,408 vehicles per day (2021 count), of which roughly 10% are trucks.

How long is Taylor Boulevard over Taylor Drainage?

The structure is 22 ft (6.8 m) long with a longest span of 20 ft (6 m) and a deck 36 ft wide.

Who owns Taylor Boulevard over Taylor Drainage?

It is owned by the owner is not reported.