US Bridges

Highline Road over Reservation Canal

Fair

Bingham County, Idaho · 0.5 S. 0.5 E. Firth · Structure no. 000000000022805

Built
1977
48 years old
Condition
Fair
inspected November 2023
Type
Tee Beam
Prestressed Concrete
Length
42 ft
1 main span
Daily traffic
500
2023 count
Owner
County
County Highway Agency

About this bridge

Highline Road over Reservation Canal is a prestressed concrete tee beam carrying Highline Road over Reservation Canal in Bingham County, Idaho. It was built in 1977, so it is 48 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 500 vehicles a day, roughly 10% of them trucks, projected to reach 750 by 2039. The structure is 42 ft (12.8 m) long and 32 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesHighline Road
CrossesReservation Canal
Location0.5 S. 0.5 E. Firth
RouteCounty Highway 0
StateIdaho
Coordinates43.29705, -112.17558
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating38 US tons
Inventory rating23 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length42 ft (12.8 m)
Longest span41 ft (12.5 m)
Deck width32 ft (9.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2023)
Projected traffic750 by 2039
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Highline Road over Reservation Canal built?

It was built in 1977, making it 48 years old in 2025.

What condition is Highline Road over Reservation Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Highline Road over Reservation Canal carry?

About 500 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Highline Road over Reservation Canal?

The structure is 42 ft (12.8 m) long with a longest span of 41 ft (12.5 m) and a deck 32 ft wide.

Who owns Highline Road over Reservation Canal?

It is owned by the County Highway Agency.