SMA9613;MCMILLAN R over Settlers Canal
GoodAda County, Idaho · In Boise · Structure no. 000000000025853
- Built
- 2000
- 25 years old
- Condition
- Good
- inspected March 2023
- Type
- Frame
- Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 7,300
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
SMA9613;MCMILLAN R over Settlers Canal is a concrete frame carrying SMA9613;MCMILLAN R over Settlers Canal in Ada County, Idaho. It was built in 2000, so it is 25 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,300 vehicles a day, projected to reach 10,950 by 2042. The structure is 32 ft (9.8 m) long and 85 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SMA9613;MCMILLAN R over Settlers Canal built?
It was built in 2000, making it 25 years old in 2025.
What condition is SMA9613;MCMILLAN R over Settlers Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does SMA9613;MCMILLAN R over Settlers Canal carry?
About 7,300 vehicles per day (2023 count).
How long is SMA9613;MCMILLAN R over Settlers Canal?
The structure is 32 ft (9.8 m) long with a longest span of 32 ft (9.8 m) and a deck 85 ft wide.
Who owns SMA9613;MCMILLAN R over Settlers Canal?
It is owned by the County Highway Agency.