Summit Road over Walker Creek
GoodWayne County, Iowa · 070202601 · Structure no. 000000000340572
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 65 ft
- 1 main span
- Daily traffic
- 30
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Summit Road over Walker Creek is a steel stringer/multi-beam or girder carrying Summit Road over Walker Creek in Wayne County, Iowa. It was built in 2023, so it is 2 years old, younger than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 30 vehicles a day, projected to reach 30 by 2043. The structure is 65 ft (19.8 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Summit Road over Walker Creek built?
It was built in 2023, making it 2 years old in 2025.
What condition is Summit Road over Walker Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Summit Road over Walker Creek carry?
About 30 vehicles per day (2022 count).
How long is Summit Road over Walker Creek?
The structure is 65 ft (19.8 m) long with a longest span of 64 ft (19.5 m) and a deck 30 ft wide.
Who owns Summit Road over Walker Creek?
It is owned by the County Highway Agency.