US Bridges

Summit Road over Walker Creek

Good

Wayne County, Iowa · 070202601 · Structure no. 000000000340572

Built
2023
2 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
65 ft
1 main span
Daily traffic
30
2022 count
Owner
County
County Highway Agency

About this bridge

Summit Road over Walker Creek is a steel stringer/multi-beam or girder carrying Summit Road over Walker Creek in Wayne County, Iowa. It was built in 2023, so it is 2 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, projected to reach 30 by 2043. The structure is 65 ft (19.8 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSummit Road
CrossesWalker Creek
Location070202601
RouteCounty Highway 0
StateIowa
Coordinates40.84101, -93.12567
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length65 ft (19.8 m)
Longest span64 ft (19.5 m)
Deck width30 ft (9.1 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2022)
Projected traffic30 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$30,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Summit Road over Walker Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is Summit Road over Walker Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Summit Road over Walker Creek carry?

About 30 vehicles per day (2022 count).

How long is Summit Road over Walker Creek?

The structure is 65 ft (19.8 m) long with a longest span of 64 ft (19.5 m) and a deck 30 ft wide.

Who owns Summit Road over Walker Creek?

It is owned by the County Highway Agency.