Second ST over Indian Creek
FairPosted for loadStory County, Iowa · 000000000 · Structure no. 000000000008200
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 153 ft
- 3 main spans
- Daily traffic
- 105
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Second ST over Indian Creek is a steel continuous stringer/multi-beam or girder carrying Second ST over Indian Creek in Story County, Iowa. It was built in 1963, so it is 62 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 105 vehicles a day, projected to reach 105 by 2043. The structure is 153 ft (46.6 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Second ST over Indian Creek built?
It was built in 1963, making it 62 years old in 2025.
What condition is Second ST over Indian Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Second ST over Indian Creek carry?
About 105 vehicles per day (2022 count).
How long is Second ST over Indian Creek?
The structure is 153 ft (46.6 m) long with a longest span of 59 ft (18 m) and a deck 26 ft wide.
Who owns Second ST over Indian Creek?
It is owned by the City or Municipal Highway Agency.