US Bridges

Ia 2 over East Fork Grand River

Fair

Ringgold County, Iowa · 2.9 Mi. E of E Jct. US169 · Structure no. 000000000046401

Built
1985
40 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
159 ft
3 main spans
Daily traffic
1,750
2022 count
Owner
State
State Highway Agency

About this bridge

Ia 2 over East Fork Grand River is a prestressed concrete stringer/multi-beam or girder carrying Ia 2 over East Fork Grand River in Ringgold County, Iowa. It was built in 1985, so it is 40 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,750 vehicles a day, roughly 15% of them trucks, projected to reach 1,750 by 2043. The structure is 159 ft (48.5 m) long and 43 ft wide. If it were closed, the detour would be 13 mi (21 km).

CarriesIa 2
CrossesEast Fork Grand River
Location2.9 Mi. E of E Jct. US169
RouteState Highway 2
StateIowa
Coordinates40.71074, -94.16852
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.3 US tons
Inventory rating35.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length159 ft (48.5 m)
Longest span69 ft (21 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,750 (2022)
Projected traffic1,750 by 2043
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed13 mi (21 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ia 2 over East Fork Grand River built?

It was built in 1985, making it 40 years old in 2025.

What condition is Ia 2 over East Fork Grand River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does Ia 2 over East Fork Grand River carry?

About 1,750 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is Ia 2 over East Fork Grand River?

The structure is 159 ft (48.5 m) long with a longest span of 69 ft (21 m) and a deck 43 ft wide.

Who owns Ia 2 over East Fork Grand River?

It is owned by the State Highway Agency.