US Bridges

370th Ave over Stony Creek

Good

Poweshiek County, Iowa · 080141001 · Structure no. 000000000293481

Built
2022
3 years old
Condition
Good
inspected December 2023
Type
Slab
Concrete Continuous
Length
131 ft
3 main spans
Daily traffic
40
2022 count
Owner
County
County Highway Agency

About this bridge

370th Ave over Stony Creek is a concrete continuous slab carrying 370th Ave over Stony Creek in Poweshiek County, Iowa. It was built in 2022, so it is 3 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40 vehicles a day, projected to reach 40 by 2043. The structure is 131 ft (39.9 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries370th Ave
CrossesStony Creek
Location080141001
RouteCounty Highway 0
StateIowa
Coordinates41.76062, -92.46008
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating59.3 US tons
Inventory rating45.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length131 ft (39.9 m)
Longest span51 ft (15.5 m)
Deck width33 ft (10.1 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2022)
Projected traffic40 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$30,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was 370th Ave over Stony Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is 370th Ave over Stony Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does 370th Ave over Stony Creek carry?

About 40 vehicles per day (2022 count).

How long is 370th Ave over Stony Creek?

The structure is 131 ft (39.9 m) long with a longest span of 51 ft (15.5 m) and a deck 33 ft wide.

Who owns 370th Ave over Stony Creek?

It is owned by the County Highway Agency.