US Bridges

Sumac Road over Silver Creek

Good

Pottawattamie County, Iowa · 077403301 · Structure no. 000000000290011

Built
2008
17 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
166 ft
3 main spans
Daily traffic
34
2022 count
Owner
County
County Highway Agency

About this bridge

Sumac Road over Silver Creek is a prestressed concrete stringer/multi-beam or girder carrying Sumac Road over Silver Creek in Pottawattamie County, Iowa. It was built in 2008, so it is 17 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 34 vehicles a day, projected to reach 34 by 2043. The structure is 166 ft (50.6 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSumac Road
CrossesSilver Creek
Location077403301
RouteCounty Highway 0
StateIowa
Coordinates41.43332, -95.44687
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.1 US tons
Inventory rating43 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length166 ft (50.6 m)
Longest span60 ft (18.3 m)
Deck width25 ft (7.5 m)
Roadway width25 ft (7.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic34 (2022)
Projected traffic34 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sumac Road over Silver Creek built?

It was built in 2008, making it 17 years old in 2025.

What condition is Sumac Road over Silver Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Sumac Road over Silver Creek carry?

About 34 vehicles per day (2022 count).

How long is Sumac Road over Silver Creek?

The structure is 166 ft (50.6 m) long with a longest span of 60 ft (18.3 m) and a deck 25 ft wide.

Who owns Sumac Road over Silver Creek?

It is owned by the County Highway Agency.