US Bridges

G30 Pinoak RD over Silver Creek

Fair

Pottawattamie County, Iowa · 076411201 · Structure no. 000000000288381

Built
2014
11 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
102 ft
3 main spans
Daily traffic
219
2022 count
Owner
County
County Highway Agency

About this bridge

G30 Pinoak RD over Silver Creek is a prestressed concrete stringer/multi-beam or girder carrying G30 Pinoak RD over Silver Creek in Pottawattamie County, Iowa. It was built in 2014, so it is 11 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 219 vehicles a day, roughly 11% of them trucks, projected to reach 219 by 2043. The structure is 102 ft (31 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesG30 Pinoak RD
CrossesSilver Creek
Location076411201
RouteCounty Highway 0
StateIowa
Coordinates41.40478, -95.50209
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating37.5 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans3
Design loadHL 93
Structure length102 ft (31 m)
Longest span39 ft (11.8 m)
Deck width31 ft (9.5 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic219 (2022)
Projected traffic219 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was G30 Pinoak RD over Silver Creek built?

It was built in 2014, making it 11 years old in 2025.

What condition is G30 Pinoak RD over Silver Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does G30 Pinoak RD over Silver Creek carry?

About 219 vehicles per day (2022 count), of which roughly 11% are trucks.

How long is G30 Pinoak RD over Silver Creek?

The structure is 102 ft (31 m) long with a longest span of 39 ft (11.8 m) and a deck 31 ft wide.

Who owns G30 Pinoak RD over Silver Creek?

It is owned by the County Highway Agency.