US Bridges

WB I-235 over 15th Street

Good

Polk County, Iowa · At Junction With US 69 · Structure no. 000000000601356

Built
2005
20 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
179 ft
3 main spans
Daily traffic
38,550
2022 count
Owner
State
State Highway Agency

About this bridge

WB I-235 over 15th Street is a steel continuous stringer/multi-beam or girder carrying WB I-235 over 15th Street in Polk County, Iowa. It was built in 2005, so it is 20 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 38,550 vehicles a day, roughly 8% of them trucks, projected to reach 38,550 by 2043. The structure is 179 ft (54.6 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWB I-235
Crosses15th Street
LocationAt Junction With US 69
RouteInterstate 235
StateIowa
Coordinates41.59679, -93.59595
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.3 US tons
Inventory rating52.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length179 ft (54.6 m)
Longest span86 ft (26.2 m)
Deck width74 ft (22.7 m)
Roadway width71 ft (21.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic38,550 (2022)
Projected traffic38,550 by 2043
Trucks8%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB I-235 over 15th Street built?

It was built in 2005, making it 20 years old in 2025.

What condition is WB I-235 over 15th Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does WB I-235 over 15th Street carry?

About 38,550 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is WB I-235 over 15th Street?

The structure is 179 ft (54.6 m) long with a longest span of 86 ft (26.2 m) and a deck 74 ft wide.

Who owns WB I-235 over 15th Street?

It is owned by the State Highway Agency.