US Bridges

US 6 over I-235

Good

Polk County, Iowa · At Jct. I-235 · Structure no. 000000000504520

Built
2003
22 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
302 ft
2 main spans
Daily traffic
21,800
2022 count
Owner
State
State Highway Agency

About this bridge

US 6 over I-235 is a steel continuous stringer/multi-beam or girder carrying US 6 over I-235 in Polk County, Iowa. It was built in 2003, so it is 22 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 21,800 vehicles a day, roughly 6% of them trucks, projected to reach 21,800 by 2044. The structure is 302 ft (92.1 m) long and 95 ft wide.

CarriesUS 6
CrossesI-235
LocationAt Jct. I-235
RouteU.S. Route 6
StateIowa
Coordinates41.62772, -93.57566
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.9 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length302 ft (92.1 m)
Longest span163 ft (49.7 m)
Deck width95 ft (28.9 m)
Roadway width82 ft (25.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,800 (2022)
Projected traffic21,800 by 2044
Trucks6%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 6 over I-235 built?

It was built in 2003, making it 22 years old in 2025.

What condition is US 6 over I-235 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does US 6 over I-235 carry?

About 21,800 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is US 6 over I-235?

The structure is 302 ft (92.1 m) long with a longest span of 163 ft (49.7 m) and a deck 95 ft wide.

Who owns US 6 over I-235?

It is owned by the State Highway Agency.