US Bridges

Penn Ave over I-235

Good

Polk County, Iowa · 5.0 Mi. E of Jct. Ia 28 · Structure no. 000000000042841

Built
2002
23 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
333 ft
2 main spans
Daily traffic
7,000
2022 count
Owner
State
State Highway Agency

About this bridge

Penn Ave over I-235 is a steel continuous stringer/multi-beam or girder carrying Penn Ave over I-235 in Polk County, Iowa. It was built in 2002, so it is 23 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,000 vehicles a day, roughly 2% of them trucks, projected to reach 7,000 by 2044. The structure is 333 ft (101.5 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPenn Ave
CrossesI-235
Location5.0 Mi. E of Jct. Ia 28
RouteCity Street 0
StateIowa
Coordinates41.59449, -93.60819
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.3 US tons
Inventory rating32.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length333 ft (101.5 m)
Longest span166 ft (50.6 m)
Deck width53 ft (16.2 m)
Roadway width41 ft (12.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,000 (2022)
Projected traffic7,000 by 2044
Trucks2%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Penn Ave over I-235 built?

It was built in 2002, making it 23 years old in 2025.

What condition is Penn Ave over I-235 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Penn Ave over I-235 carry?

About 7,000 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is Penn Ave over I-235?

The structure is 333 ft (101.5 m) long with a longest span of 166 ft (50.6 m) and a deck 53 ft wide.

Who owns Penn Ave over I-235?

It is owned by the State Highway Agency.