US Bridges

42nd ST SW over I-235

Good

Polk County, Iowa · 1.5 MI East of JCT Ia 28 · Structure no. 000000000042361

Built
2003
22 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
219 ft
2 main spans
Daily traffic
11,600
2022 count
Owner
State
State Highway Agency

About this bridge

42nd ST SW over I-235 is a prestressed concrete stringer/multi-beam or girder carrying 42nd ST SW over I-235 in Polk County, Iowa. It was built in 2003, so it is 22 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,600 vehicles a day, roughly 3% of them trucks, projected to reach 11,600 by 2044. The structure is 219 ft (66.8 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries42nd ST SW
CrossesI-235
Location1.5 MI East of JCT Ia 28
RouteCity Street 0
StateIowa
Coordinates41.59096, -93.67438
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99.8 US tons
Inventory rating39.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length219 ft (66.8 m)
Longest span115 ft (35.1 m)
Deck width74 ft (22.5 m)
Roadway width53 ft (16.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,600 (2022)
Projected traffic11,600 by 2044
Trucks3%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 42nd ST SW over I-235 built?

It was built in 2003, making it 22 years old in 2025.

What condition is 42nd ST SW over I-235 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does 42nd ST SW over I-235 carry?

About 11,600 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is 42nd ST SW over I-235?

The structure is 219 ft (66.8 m) long with a longest span of 115 ft (35.1 m) and a deck 74 ft wide.

Who owns 42nd ST SW over I-235?

It is owned by the State Highway Agency.