US Bridges

WB I-235 over I-35

Fair

Polk County, Iowa · At West Junction I-35-80 · Structure no. 000000000041920

Built
1966
59 years old
Condition
Fair
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
262 ft
4 main spans
Daily traffic
24,250
2022 count
Owner
State
State Highway Agency

About this bridge

WB I-235 over I-35 is a prestressed concrete stringer/multi-beam or girder carrying WB I-235 over I-35 in Polk County, Iowa. It was built in 1966, so it is 59 years old, older than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 24,250 vehicles a day, roughly 7% of them trucks, projected to reach 24,250 by 2043. The structure is 262 ft (79.9 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWB I-235
CrossesI-35
LocationAt West Junction I-35-80
RouteInterstate 235
StateIowa
Coordinates41.59231, -93.77681
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating80.5 US tons
Inventory rating30.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length262 ft (79.9 m)
Longest span84 ft (25.6 m)
Deck width52 ft (16 m)
Roadway width46 ft (14.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,250 (2022)
Projected traffic24,250 by 2043
Trucks7%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB I-235 over I-35 built?

It was built in 1966, making it 59 years old in 2025.

What condition is WB I-235 over I-35 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does WB I-235 over I-35 carry?

About 24,250 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is WB I-235 over I-35?

The structure is 262 ft (79.9 m) long with a longest span of 84 ft (25.6 m) and a deck 52 ft wide.

Who owns WB I-235 over I-35?

It is owned by the State Highway Agency.