US Bridges

Douglas Ave over I 35 & I 80

Good

Polk County, Iowa · At Junction I-80 & I-35 · Structure no. 000000000041331

Built
2002
23 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
293 ft
2 main spans
Daily traffic
8,570
2022 count
Owner
State
State Highway Agency

About this bridge

Douglas Ave over I 35 & I 80 is a steel continuous stringer/multi-beam or girder carrying Douglas Ave over I 35 & I 80 in Polk County, Iowa. It was built in 2002, so it is 23 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,570 vehicles a day, roughly 6% of them trucks, projected to reach 8,570 by 2044. The structure is 293 ft (89.2 m) long and 113 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesDouglas Ave
CrossesI 35 & I 80
LocationAt Junction I-80 & I-35
RouteCity Street 0
StateIowa
Coordinates41.62939, -93.77755
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80.9 US tons
Inventory rating48.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length293 ft (89.2 m)
Longest span146 ft (44.6 m)
Deck width113 ft (34.3 m)
Roadway width94 ft (28.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,570 (2022)
Projected traffic8,570 by 2044
Trucks6%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Douglas Ave over I 35 & I 80 built?

It was built in 2002, making it 23 years old in 2025.

What condition is Douglas Ave over I 35 & I 80 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Douglas Ave over I 35 & I 80 carry?

About 8,570 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is Douglas Ave over I 35 & I 80?

The structure is 293 ft (89.2 m) long with a longest span of 146 ft (44.6 m) and a deck 113 ft wide.

Who owns Douglas Ave over I 35 & I 80?

It is owned by the State Highway Agency.