US Bridges

120th Street over West Tarkio River

Fair

Page County, Iowa · 070381401 · Structure no. 000000000268191

Built
1979
46 years old
Condition
Fair
inspected November 2022
Type
Stringer/Multi-beam or Girder
Steel
Length
113 ft
3 main spans
Daily traffic
20
2022 count
Owner
County
County Highway Agency

About this bridge

120th Street over West Tarkio River is a steel stringer/multi-beam or girder carrying 120th Street over West Tarkio River in Page County, Iowa. It was built in 1979, so it is 46 years old, older than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 20 vehicles a day, projected to reach 20 by 2042. The structure is 113 ft (34.4 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

Carries120th Street
CrossesWest Tarkio River
Location070381401
RouteCounty Highway 0
StateIowa
Coordinates40.8722, -95.18612
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2022
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating30.6 US tons
Inventory rating18.4 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans3
Design loadUnknown
Structure length113 ft (34.4 m)
Longest span38 ft (11.6 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2022)
Projected traffic20 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 120th Street over West Tarkio River built?

It was built in 1979, making it 46 years old in 2025.

What condition is 120th Street over West Tarkio River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.

How much traffic does 120th Street over West Tarkio River carry?

About 20 vehicles per day (2022 count).

How long is 120th Street over West Tarkio River?

The structure is 113 ft (34.4 m) long with a longest span of 38 ft (11.6 m) and a deck 24 ft wide.

Who owns 120th Street over West Tarkio River?

It is owned by the County Highway Agency.