US Bridges

370th ST over Rock Creek

Good

Mitchell County, Iowa · 0.4 MI W Echo Ave · Structure no. 000000000248151

Built
2018
7 years old
Condition
Good
inspected December 2023
Type
Culvert
Concrete
Length
40 ft
3 main spans
Daily traffic
29
2022 count
Owner
County
County Highway Agency

About this bridge

370th ST over Rock Creek is a concrete culvert carrying 370th ST over Rock Creek in Mitchell County, Iowa. It was built in 2018, so it is 7 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 29 vehicles a day, projected to reach 29 by 2043. The structure is 40 ft (12.1 m) long. If it were closed, the detour would be 1.9 mi (3 km).

Carries370th ST
CrossesRock Creek
Location0.4 MI W Echo Ave
RouteCounty Highway 0
StateIowa
Coordinates43.29895, -92.95374
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating65.4 US tons
Inventory rating50.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length40 ft (12.1 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29 (2022)
Projected traffic29 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 370th ST over Rock Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is 370th ST over Rock Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does 370th ST over Rock Creek carry?

About 29 vehicles per day (2022 count).

How long is 370th ST over Rock Creek?

The structure is 40 ft (12.1 m) long with a longest span of 12 ft (3.7 m).

Who owns 370th ST over Rock Creek?

It is owned by the County Highway Agency and maintained by the Town or Township Highway Agency.