US Bridges

Upland Trail over Drainage

Good

Madison County, Iowa · 076260404 · Structure no. 000000000233591

Built
2015
10 years old
Condition
Good
inspected August 2021
Type
Culvert
Steel
Length
22 ft
4 main spans
Daily traffic
45
2022 count
Owner
County
County Highway Agency

About this bridge

Upland Trail over Drainage is a steel culvert carrying Upland Trail over Drainage in Madison County, Iowa. It was built in 2015, so it is 10 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 45 vehicles a day, projected to reach 45 by 2043. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 6.2 mi (10 km).

CarriesUpland Trail
CrossesDrainage
Location076260404
RouteCounty Highway 0
StateIowa
Coordinates41.40543, -93.85923
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionAugust 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.6 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans4
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span4 ft (1.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic45 (2022)
Projected traffic45 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Upland Trail over Drainage built?

It was built in 2015, making it 10 years old in 2025.

What condition is Upland Trail over Drainage in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2021.

How much traffic does Upland Trail over Drainage carry?

About 45 vehicles per day (2022 count).

How long is Upland Trail over Drainage?

The structure is 22 ft (6.7 m) long with a longest span of 4 ft (1.2 m).

Who owns Upland Trail over Drainage?

It is owned by the County Highway Agency.