US Bridges

Lisbon Boulevard over US 30

Good

Linn County, Iowa · 3.5 Mi. E US30/IA1 Intchg · Structure no. 000000000700550

Built
2019
6 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
235 ft
2 main spans
Daily traffic
1,208
2022 count
Owner
State
State Highway Agency

About this bridge

Lisbon Boulevard over US 30 is a prestressed concrete stringer/multi-beam or girder carrying Lisbon Boulevard over US 30 in Linn County, Iowa. It was built in 2019, so it is 6 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,208 vehicles a day, roughly 6% of them trucks, projected to reach 1,208 by 2044. The structure is 235 ft (71.6 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLisbon Boulevard
CrossesUS 30
Location3.5 Mi. E US30/IA1 Intchg
RouteCounty Highway 0
StateIowa
Coordinates41.91159, -91.36627
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length235 ft (71.6 m)
Longest span116 ft (35.4 m)
Deck width63 ft (19.3 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,208 (2022)
Projected traffic1,208 by 2044
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Lisbon Boulevard over US 30 built?

It was built in 2019, making it 6 years old in 2025.

What condition is Lisbon Boulevard over US 30 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Lisbon Boulevard over US 30 carry?

About 1,208 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is Lisbon Boulevard over US 30?

The structure is 235 ft (71.6 m) long with a longest span of 116 ft (35.4 m) and a deck 63 ft wide.

Who owns Lisbon Boulevard over US 30?

It is owned by the State Highway Agency.