US Bridges

I 380 NB over 15th & 16th Av SW

Fair

Linn County, Iowa · 2.5 Mi. N of Jct. US 30 · Structure no. 000000000607060

Built
1975
50 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
487 ft
9 main spans
Daily traffic
34,450
2022 count
Owner
State
State Highway Agency

About this bridge

I 380 NB over 15th & 16th Av SW is a prestressed concrete stringer/multi-beam or girder carrying I 380 NB over 15th & 16th Av SW in Linn County, Iowa. It was built in 1975, so it is 50 years old, older than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 34,450 vehicles a day, roughly 12% of them trucks, projected to reach 34,450 by 2042. The structure is 487 ft (148.4 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 380 NB
Crosses15th & 16th Av SW
Location2.5 Mi. N of Jct. US 30
RouteInterstate 380
StateIowa
Coordinates41.96151, -91.67062
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating59.1 US tons
Inventory rating33 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans9
Design loadHS 20 + Mod
Structure length487 ft (148.4 m)
Longest span65 ft (19.8 m)
Deck width55 ft (16.9 m)
Roadway width52 ft (15.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic34,450 (2022)
Projected traffic34,450 by 2042
Trucks12%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 380 NB over 15th & 16th Av SW built?

It was built in 1975, making it 50 years old in 2025.

What condition is I 380 NB over 15th & 16th Av SW in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does I 380 NB over 15th & 16th Av SW carry?

About 34,450 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is I 380 NB over 15th & 16th Av SW?

The structure is 487 ft (148.4 m) long with a longest span of 65 ft (19.8 m) and a deck 55 ft wide.

Who owns I 380 NB over 15th & 16th Av SW?

It is owned by the State Highway Agency.