29th ST DR SE over Indian Creek
FairLinn County, Iowa · 000000000 · Structure no. 000000000503000
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 212 ft
- 4 main spans
- Daily traffic
- 5,800
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
29th ST DR SE over Indian Creek is a prestressed concrete stringer/multi-beam or girder carrying 29th ST DR SE over Indian Creek in Linn County, Iowa. It was built in 1972, so it is 53 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,800 vehicles a day, projected to reach 5,800 by 2043. The structure is 212 ft (64.6 m) long and 41 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 29th ST DR SE over Indian Creek built?
It was built in 1972, making it 53 years old in 2025.
What condition is 29th ST DR SE over Indian Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does 29th ST DR SE over Indian Creek carry?
About 5,800 vehicles per day (2021 count).
How long is 29th ST DR SE over Indian Creek?
The structure is 212 ft (64.6 m) long with a longest span of 70 ft (21.3 m) and a deck 41 ft wide.
Who owns 29th ST DR SE over Indian Creek?
It is owned by the City or Municipal Highway Agency.