US Bridges

Ia 2 over US 61

Fair

Lee County, Iowa · At the Jct. U.S. 61 · Structure no. 000000000609570

Built
2011
14 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
275 ft
2 main spans
Daily traffic
6,200
2022 count
Owner
State
State Highway Agency

About this bridge

Ia 2 over US 61 is a prestressed concrete stringer/multi-beam or girder carrying Ia 2 over US 61 in Lee County, Iowa. It was built in 2011, so it is 14 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,200 vehicles a day, roughly 7% of them trucks, projected to reach 6,200 by 2044. The structure is 275 ft (83.9 m) long and 62 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesIa 2
CrossesUS 61
LocationAt the Jct. U.S. 61
RouteState Highway 2
StateIowa
Coordinates40.6267, -91.39924
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99.8 US tons
Inventory rating39.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length275 ft (83.9 m)
Longest span136 ft (41.5 m)
Deck width62 ft (18.9 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,200 (2022)
Projected traffic6,200 by 2044
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ia 2 over US 61 built?

It was built in 2011, making it 14 years old in 2025.

What condition is Ia 2 over US 61 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Ia 2 over US 61 carry?

About 6,200 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is Ia 2 over US 61?

The structure is 275 ft (83.9 m) long with a longest span of 136 ft (41.5 m) and a deck 62 ft wide.

Who owns Ia 2 over US 61?

It is owned by the State Highway Agency.