FM SW Naples Av over Dirty Face Creek
FairJohnson County, Iowa · 078061704 · Structure no. 000000000203271
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected April 2023
- Type
- Slab
- Concrete Continuous
- Length
- 91 ft
- 3 main spans
- Daily traffic
- 270
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
FM SW Naples Av over Dirty Face Creek is a concrete continuous slab carrying FM SW Naples Av over Dirty Face Creek in Johnson County, Iowa. It was built in 1980, so it is 45 years old, younger than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 270 vehicles a day, roughly 17% of them trucks, projected to reach 270 by 2043. The structure is 91 ft (27.7 m) long and 33 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM SW Naples Av over Dirty Face Creek built?
It was built in 1980, making it 45 years old in 2025.
What condition is FM SW Naples Av over Dirty Face Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does FM SW Naples Av over Dirty Face Creek carry?
About 270 vehicles per day (2021 count), of which roughly 17% are trucks.
How long is FM SW Naples Av over Dirty Face Creek?
The structure is 91 ft (27.7 m) long with a longest span of 33 ft (10.1 m) and a deck 33 ft wide.
Who owns FM SW Naples Av over Dirty Face Creek?
It is owned by the County Highway Agency.