US Bridges

Ia 3 over E Fork Des Moines River

Good

Humboldt County, Iowa · 1.8 Mi. E. of US 169 · Structure no. 000000000029011

Built
2018
7 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
367 ft
3 main spans
Daily traffic
2,510
2022 count
Owner
State
State Highway Agency

About this bridge

Ia 3 over E Fork Des Moines River is a prestressed concrete stringer/multi-beam or girder carrying Ia 3 over E Fork Des Moines River in Humboldt County, Iowa. It was built in 2018, so it is 7 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,510 vehicles a day, roughly 20% of them trucks, projected to reach 2,510 by 2044. The structure is 367 ft (111.9 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIa 3
CrossesE Fork Des Moines River
Location1.8 Mi. E. of US 169
RouteState Highway 3
StateIowa
Coordinates42.73166, -94.19224
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length367 ft (111.9 m)
Longest span213 ft (64.9 m)
Deck width47 ft (14.4 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,510 (2022)
Projected traffic2,510 by 2044
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ia 3 over E Fork Des Moines River built?

It was built in 2018, making it 7 years old in 2025.

What condition is Ia 3 over E Fork Des Moines River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Ia 3 over E Fork Des Moines River carry?

About 2,510 vehicles per day (2022 count), of which roughly 20% are trucks.

How long is Ia 3 over E Fork Des Moines River?

The structure is 367 ft (111.9 m) long with a longest span of 213 ft (64.9 m) and a deck 47 ft wide.

Who owns Ia 3 over E Fork Des Moines River?

It is owned by the State Highway Agency.