US Bridges

J20 Salem RD over Mud Creek

Good

Henry County, Iowa · 070052705 · Structure no. 000000000179971

Built
2019
6 years old
Condition
Good
inspected February 2022
Type
Slab
Concrete Continuous
Length
151 ft
3 main spans
Daily traffic
400
2022 count
Owner
County
County Highway Agency

About this bridge

J20 Salem RD over Mud Creek is a concrete continuous slab carrying J20 Salem RD over Mud Creek in Henry County, Iowa. It was built in 2019, so it is 6 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 400 vehicles a day, roughly 13% of them trucks, projected to reach 400 by 2043. The structure is 151 ft (46 m) long and 33 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesJ20 Salem RD
CrossesMud Creek
Location070052705
RouteCounty Highway 0
StateIowa
Coordinates40.82949, -91.4232
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length151 ft (46 m)
Longest span59 ft (18 m)
Deck width33 ft (10.1 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic400 (2022)
Projected traffic400 by 2043
Trucks13%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was J20 Salem RD over Mud Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is J20 Salem RD over Mud Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2022.

How much traffic does J20 Salem RD over Mud Creek carry?

About 400 vehicles per day (2022 count), of which roughly 13% are trucks.

How long is J20 Salem RD over Mud Creek?

The structure is 151 ft (46 m) long with a longest span of 59 ft (18 m) and a deck 33 ft wide.

Who owns J20 Salem RD over Mud Creek?

It is owned by the County Highway Agency.