US Bridges

Madrid Ave over Stowe Creek

Good

Harrison County, Iowa · S15 T81N R43W · Structure no. 000000000366895

Built
2023
2 years old
Condition
Good
inspected February 2024
Type
Culvert
Steel
Length
26 ft
2 main spans
Daily traffic
15
2022 count
Owner
County
County Highway Agency

About this bridge

Madrid Ave over Stowe Creek is a steel culvert carrying Madrid Ave over Stowe Creek in Harrison County, Iowa. It was built in 2023, so it is 2 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15 vehicles a day, projected to reach 15 by 2044. The structure is 26 ft (7.9 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMadrid Ave
CrossesStowe Creek
LocationS15 T81N R43W
RouteCounty Highway 0
StateIowa
Coordinates41.83421, -95.84765
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans2
Design loadUnknown
Structure length26 ft (7.9 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15 (2022)
Projected traffic15 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Madrid Ave over Stowe Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is Madrid Ave over Stowe Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Madrid Ave over Stowe Creek carry?

About 15 vehicles per day (2022 count).

How long is Madrid Ave over Stowe Creek?

The structure is 26 ft (7.9 m) long with a longest span of 10 ft (3 m).

Who owns Madrid Ave over Stowe Creek?

It is owned by the County Highway Agency.