US Bridges

SR 350th Street over I-35

Fair

Hamilton County, Iowa · 2.0 Mi. S of Jct. Ia 175 · Structure no. 000000000026680

Built
1966
59 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
218 ft
4 main spans
Daily traffic
71
2021 count
Owner
State
State Highway Agency

About this bridge

SR 350th Street over I-35 is a prestressed concrete stringer/multi-beam or girder carrying SR 350th Street over I-35 in Hamilton County, Iowa. It was built in 1966, so it is 59 years old, older than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 71 vehicles a day, projected to reach 71 by 2043. The structure is 218 ft (66.4 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSR 350th Street
CrossesI-35
Location2.0 Mi. S of Jct. Ia 175
RouteCounty Highway 0
StateIowa
Coordinates42.28185, -93.57078
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating68.2 US tons
Inventory rating27.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadH 20
Structure length218 ft (66.4 m)
Longest span69 ft (21 m)
Deck width32 ft (9.9 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic71 (2021)
Projected traffic71 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 350th Street over I-35 built?

It was built in 1966, making it 59 years old in 2025.

What condition is SR 350th Street over I-35 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does SR 350th Street over I-35 carry?

About 71 vehicles per day (2021 count).

How long is SR 350th Street over I-35?

The structure is 218 ft (66.4 m) long with a longest span of 69 ft (21 m) and a deck 32 ft wide.

Who owns SR 350th Street over I-35?

It is owned by the State Highway Agency.