US Bridges

I 29 SB over Plum Creek

Good

Fremont County, Iowa · 0.5 Mi. S of Jct. SR J-24 · Structure no. 000000000600145

Built
2009
16 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
242 ft
3 main spans
Daily traffic
6,100
2022 count
Owner
State
State Highway Agency

About this bridge

I 29 SB over Plum Creek is a prestressed concrete stringer/multi-beam or girder carrying I 29 SB over Plum Creek in Fremont County, Iowa. It was built in 2009, so it is 16 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,100 vehicles a day, roughly 34% of them trucks, projected to reach 6,100 by 2043. The structure is 242 ft (73.8 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 29 SB
CrossesPlum Creek
Location0.5 Mi. S of Jct. SR J-24
RouteInterstate 29
StateIowa
Coordinates40.81487, -95.80627
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating40.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length242 ft (73.8 m)
Longest span97 ft (29.6 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,100 (2022)
Projected traffic6,100 by 2043
Trucks34%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I 29 SB over Plum Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is I 29 SB over Plum Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does I 29 SB over Plum Creek carry?

About 6,100 vehicles per day (2022 count), of which roughly 34% are trucks.

How long is I 29 SB over Plum Creek?

The structure is 242 ft (73.8 m) long with a longest span of 97 ft (29.6 m) and a deck 43 ft wide.

Who owns I 29 SB over Plum Creek?

It is owned by the State Highway Agency.