US Bridges

New Donnan RD over The Coulee

Fair

Fayette County, Iowa · 093090206 · Structure no. 000000000004150

Built
1925
100 years old
Condition
Fair
inspected October 2024
Type
Culvert
Concrete
Length
27 ft
2 main spans
Daily traffic
26
2022 count
Owner
County
County Highway Agency

About this bridge

New Donnan RD over The Coulee is a concrete culvert carrying New Donnan RD over The Coulee in Fayette County, Iowa. It was built in 1925, so it is 100 years old, older than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 26 vehicles a day, projected to reach 26 by 2044. The structure is 27 ft (8.2 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesNew Donnan RD
CrossesThe Coulee
Location093090206
RouteCounty Highway 0
StateIowa
Coordinates42.89951, -91.87531
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadOther
Structure length27 ft (8.2 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26 (2022)
Projected traffic26 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was New Donnan RD over The Coulee built?

It was built in 1925, making it 100 years old in 2025.

What condition is New Donnan RD over The Coulee in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does New Donnan RD over The Coulee carry?

About 26 vehicles per day (2022 count).

How long is New Donnan RD over The Coulee?

The structure is 27 ft (8.2 m) long with a longest span of 12 ft (3.7 m).

Who owns New Donnan RD over The Coulee?

It is owned by the County Highway Agency.