US Bridges

Plank Road over Honey Creek

Good

Des Moines County, Iowa · 070032400 · Structure no. 000000000366050

Built
2020
5 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete Continuous
Length
29 ft
2 main spans
Daily traffic
373
2022 count
Owner
County
County Highway Agency

About this bridge

Plank Road over Honey Creek is a concrete continuous culvert carrying Plank Road over Honey Creek in Des Moines County, Iowa. It was built in 2020, so it is 5 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 373 vehicles a day, projected to reach 373 by 2043. The structure is 29 ft (8.8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPlank Road
CrossesHoney Creek
Location070032400
RouteCounty Highway 0
StateIowa
Coordinates40.84946, -91.15595
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating57.1 US tons
Inventory rating44.3 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHL 93
Structure length29 ft (8.8 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic373 (2022)
Projected traffic373 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Plank Road over Honey Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is Plank Road over Honey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Plank Road over Honey Creek carry?

About 373 vehicles per day (2022 count).

How long is Plank Road over Honey Creek?

The structure is 29 ft (8.8 m) long with a longest span of 14 ft (4.3 m).

Who owns Plank Road over Honey Creek?

It is owned by the County Highway Agency.