US Bridges

Harvest Ave over Trib Fabius Creek

Good

Davis County, Iowa · 067140804 · Structure no. 000000000133141

Built
2018
7 years old
Condition
Good
inspected May 2022
Type
Culvert
Concrete Continuous
Length
29 ft
2 main spans
Daily traffic
30
2022 count
Owner
County
County Highway Agency

About this bridge

Harvest Ave over Trib Fabius Creek is a concrete continuous culvert carrying Harvest Ave over Trib Fabius Creek in Davis County, Iowa. It was built in 2018, so it is 7 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, projected to reach 30 by 2043. The structure is 29 ft (8.8 m) long.

CarriesHarvest Ave
CrossesTrib Fabius Creek
Location067140804
RouteCounty Highway 0
StateIowa
Coordinates40.61953, -92.50397
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating57.1 US tons
Inventory rating44.3 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHL 93
Structure length29 ft (8.8 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2022)
Projected traffic30 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Harvest Ave over Trib Fabius Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is Harvest Ave over Trib Fabius Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.

How much traffic does Harvest Ave over Trib Fabius Creek carry?

About 30 vehicles per day (2022 count).

How long is Harvest Ave over Trib Fabius Creek?

The structure is 29 ft (8.8 m) long with a longest span of 12 ft (3.7 m).

Who owns Harvest Ave over Trib Fabius Creek?

It is owned by the County Highway Agency.