US Bridges

270th ST over Silver Creek

Good

Clinton County, Iowa · 000000000 · Structure no. 000000000122352

Built
2009
16 years old
Condition
Good
inspected June 2024
Type
Slab
Concrete Continuous
Length
143 ft
3 main spans
Daily traffic
220
2022 count
Owner
County
County Highway Agency

About this bridge

270th ST over Silver Creek is a concrete continuous slab carrying 270th ST over Silver Creek in Clinton County, Iowa. It was built in 2009, so it is 16 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 220 vehicles a day, projected to reach 220 by 2044. The structure is 143 ft (43.6 m) long and 33 ft wide. If it were closed, the detour would be 5 mi (8 km).

Carries270th ST
CrossesSilver Creek
Location000000000
RouteCounty Highway 0
StateIowa
Coordinates41.78587, -90.55431
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating94 US tons
Inventory rating50.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length143 ft (43.6 m)
Longest span55 ft (16.8 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic220 (2022)
Projected traffic220 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 270th ST over Silver Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is 270th ST over Silver Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does 270th ST over Silver Creek carry?

About 220 vehicles per day (2022 count).

How long is 270th ST over Silver Creek?

The structure is 143 ft (43.6 m) long with a longest span of 55 ft (16.8 m) and a deck 33 ft wide.

Who owns 270th ST over Silver Creek?

It is owned by the County Highway Agency.