FM 300th ST over Drainage Ditch
FairClay County, Iowa · 097352201 · Structure no. 000000000117250
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete Continuous
- Length
- 128 ft
- 3 main spans
- Daily traffic
- 469
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
FM 300th ST over Drainage Ditch is a concrete continuous slab carrying FM 300th ST over Drainage Ditch in Clay County, Iowa. It was built in 1963, so it is 62 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 469 vehicles a day, roughly 27% of them trucks, projected to reach 469 by 2043. The structure is 128 ft (39 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 300th ST over Drainage Ditch built?
It was built in 1963, making it 62 years old in 2025.
What condition is FM 300th ST over Drainage Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does FM 300th ST over Drainage Ditch carry?
About 469 vehicles per day (2022 count), of which roughly 27% are trucks.
How long is FM 300th ST over Drainage Ditch?
The structure is 128 ft (39 m) long with a longest span of 49 ft (14.9 m) and a deck 30 ft wide.
Who owns FM 300th ST over Drainage Ditch?
It is owned by the County Highway Agency.