US Bridges

H28 Meadow ST over North Otter Creek

Good

Clarke County, Iowa · 073253405 · Structure no. 000000000115242

Built
2021
4 years old
Condition
Good
inspected September 2023
Type
Slab
Concrete Continuous
Length
101 ft
3 main spans
Daily traffic
60
2022 count
Owner
County
County Highway Agency

About this bridge

H28 Meadow ST over North Otter Creek is a concrete continuous slab carrying H28 Meadow ST over North Otter Creek in Clarke County, Iowa. It was built in 2021, so it is 4 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60 vehicles a day, projected to reach 60 by 2043. The structure is 101 ft (30.8 m) long and 27 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesH28 Meadow ST
CrossesNorth Otter Creek
Location073253405
RouteCounty Highway 0
StateIowa
Coordinates41.07804, -93.72182
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length101 ft (30.8 m)
Longest span39 ft (11.9 m)
Deck width27 ft (8.3 m)
Roadway width25 ft (7.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2022)
Projected traffic60 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$30,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was H28 Meadow ST over North Otter Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is H28 Meadow ST over North Otter Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does H28 Meadow ST over North Otter Creek carry?

About 60 vehicles per day (2022 count).

How long is H28 Meadow ST over North Otter Creek?

The structure is 101 ft (30.8 m) long with a longest span of 39 ft (11.9 m) and a deck 27 ft wide.

Who owns H28 Meadow ST over North Otter Creek?

It is owned by the County Highway Agency.