NB I-35 over Beaver Dam Creek

Good

Cerro Gordo County, Iowa · 0.6 Mi. S of Jct. SR B43 · Structure no. 000000000602320

Built
1972
53 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
146 ft
3 main spans
Daily traffic
9,050
2023 count
Owner
State
State Highway Agency

About this bridge

NB I-35 over Beaver Dam Creek is a prestressed concrete stringer/multi-beam or girder carrying NB I-35 over Beaver Dam Creek in Cerro Gordo County, Iowa. It was built in 1972, so it is 53 years old, older than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,050 vehicles a day, roughly 29% of them trucks, projected to reach 9,050 by 2043. The structure is 146 ft (44.5 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNB I-35
CrossesBeaver Dam Creek
Location0.6 Mi. S of Jct. SR B43
RouteInterstate 35
StateIowa
Coordinates43.05951, -93.34235
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.5 US tons
Inventory rating36.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length146 ft (44.5 m)
Longest span57 ft (17.4 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,050 (2023)
Projected traffic9,050 by 2043
Trucks29%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NB I-35 over Beaver Dam Creek built?

It was built in 1972, making it 53 years old in 2025.

What condition is NB I-35 over Beaver Dam Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does NB I-35 over Beaver Dam Creek carry?

About 9,050 vehicles per day (2023 count), of which roughly 29% are trucks.

How long is NB I-35 over Beaver Dam Creek?

The structure is 146 ft (44.5 m) long with a longest span of 57 ft (17.4 m) and a deck 43 ft wide.

Who owns NB I-35 over Beaver Dam Creek?

It is owned by the State Highway Agency.