US Bridges

Cardinal over Winnebago River

Good

Cerro Gordo County, Iowa · 097220904 · Structure no. 000000000106931

Built
1998
27 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
151 ft
3 main spans
Daily traffic
26
2022 count
Owner
County
County Highway Agency

About this bridge

Cardinal over Winnebago River is a prestressed concrete stringer/multi-beam or girder carrying Cardinal over Winnebago River in Cerro Gordo County, Iowa. It was built in 1998, so it is 27 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26 vehicles a day, projected to reach 26 by 2044. The structure is 151 ft (46 m) long and 25 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCardinal
CrossesWinnebago River
Location097220904
RouteCounty Highway 0
StateIowa
Coordinates43.23007, -93.45789
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.8 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length151 ft (46 m)
Longest span59 ft (18 m)
Deck width25 ft (7.6 m)
Roadway width25 ft (7.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26 (2022)
Projected traffic26 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cardinal over Winnebago River built?

It was built in 1998, making it 27 years old in 2025.

What condition is Cardinal over Winnebago River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Cardinal over Winnebago River carry?

About 26 vehicles per day (2022 count).

How long is Cardinal over Winnebago River?

The structure is 151 ft (46 m) long with a longest span of 59 ft (18 m) and a deck 25 ft wide.

Who owns Cardinal over Winnebago River?

It is owned by the County Highway Agency.