US Bridges

Pine Ave over I-80

FairPosted for load

Cedar County, Iowa · 2.0 Mi. E of W Jct. Ia 38 · Structure no. 000000000018640

Built
1960
65 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
266 ft
4 main spans
Daily traffic
70
2022 count
Owner
State
State Highway Agency

About this bridge

Pine Ave over I-80 is a steel continuous stringer/multi-beam or girder carrying Pine Ave over I-80 in Cedar County, Iowa. It was built in 1960, so it is 65 years old, older than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 70 vehicles a day, projected to reach 70 by 2044. The structure is 266 ft (81.1 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesPine Ave
CrossesI-80
Location2.0 Mi. E of W Jct. Ia 38
RouteCounty Highway 0
StateIowa
Coordinates41.64364, -91.07561
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating31.9 US tons
Inventory rating20.3 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length266 ft (81.1 m)
Longest span73 ft (22.3 m)
Deck width28 ft (8.6 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic70 (2022)
Projected traffic70 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pine Ave over I-80 built?

It was built in 1960, making it 65 years old in 2025.

What condition is Pine Ave over I-80 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Pine Ave over I-80 carry?

About 70 vehicles per day (2022 count).

How long is Pine Ave over I-80?

The structure is 266 ft (81.1 m) long with a longest span of 73 ft (22.3 m) and a deck 28 ft wide.

Who owns Pine Ave over I-80?

It is owned by the State Highway Agency.