Ia 83 over East Nishnabotna River
FairCass County, Iowa · 2.1 Mi. E of Jct. Ia 173 · Structure no. 000000000017800
- Built
- 1934
- 91 years old, rebuilt 1982
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 215 ft
- 3 main spans
- Daily traffic
- 3,690
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Ia 83 over East Nishnabotna River is a steel continuous stringer/multi-beam or girder carrying Ia 83 over East Nishnabotna River in Cass County, Iowa. It was built in 1934 and reconstructed in 1982, so it is 91 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,690 vehicles a day, roughly 5% of them trucks, projected to reach 3,690 by 2044. The structure is 215 ft (65.5 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ia 83 over East Nishnabotna River built?
It was built in 1934, making it 91 years old in 2025. It was reconstructed in 1982.
What condition is Ia 83 over East Nishnabotna River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Ia 83 over East Nishnabotna River carry?
About 3,690 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Ia 83 over East Nishnabotna River?
The structure is 215 ft (65.5 m) long with a longest span of 82 ft (25 m) and a deck 26 ft wide.
Who owns Ia 83 over East Nishnabotna River?
It is owned by the State Highway Agency.