270th ST over Quarter Section Run
FairPosted for loadBremer County, Iowa · 091133501 · Structure no. 000000000079010
- Built
- 1951
- 74 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 124 ft
- 3 main spans
- Daily traffic
- 118
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
270th ST over Quarter Section Run is a steel continuous stringer/multi-beam or girder carrying 270th ST over Quarter Section Run in Bremer County, Iowa. It was built in 1951, so it is 74 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 118 vehicles a day, projected to reach 118 by 2043. The structure is 124 ft (37.8 m) long and 22 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 270th ST over Quarter Section Run built?
It was built in 1951, making it 74 years old in 2025.
What condition is 270th ST over Quarter Section Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does 270th ST over Quarter Section Run carry?
About 118 vehicles per day (2022 count).
How long is 270th ST over Quarter Section Run?
The structure is 124 ft (37.8 m) long with a longest span of 47 ft (14.3 m) and a deck 22 ft wide.
Who owns 270th ST over Quarter Section Run?
It is owned by the County Highway Agency.