US Bridges

FM over Quarter Section Run Ck

Fair

Bremer County, Iowa · 091133402 · Structure no. 000000000079001

Built
2001
24 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
142 ft
3 main spans
Daily traffic
2,023
2022 count
Owner
County
County Highway Agency

About this bridge

FM over Quarter Section Run Ck is a prestressed concrete stringer/multi-beam or girder carrying FM over Quarter Section Run Ck in Bremer County, Iowa. It was built in 2001, so it is 24 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,023 vehicles a day, projected to reach 2,023 by 2043. The structure is 142 ft (43.3 m) long and 33 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesFM
CrossesQuarter Section Run Ck
Location091133402
RouteCounty Highway 0
StateIowa
Coordinates42.65434, -92.37668
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating82.2 US tons
Inventory rating49.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length142 ft (43.3 m)
Longest span52 ft (15.9 m)
Deck width33 ft (10.1 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,023 (2022)
Projected traffic2,023 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$30,000 (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was FM over Quarter Section Run Ck built?

It was built in 2001, making it 24 years old in 2025.

What condition is FM over Quarter Section Run Ck in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does FM over Quarter Section Run Ck carry?

About 2,023 vehicles per day (2022 count).

How long is FM over Quarter Section Run Ck?

The structure is 142 ft (43.3 m) long with a longest span of 52 ft (15.9 m) and a deck 33 ft wide.

Who owns FM over Quarter Section Run Ck?

It is owned by the County Highway Agency.