250th ST over Quarter Section Run
FairPosted for loadBremer County, Iowa · 091132405 · Structure no. 000000000078941
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 86 ft
- 4 main spans
- Daily traffic
- 97
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
250th ST over Quarter Section Run is a wood or timber stringer/multi-beam or girder carrying 250th ST over Quarter Section Run in Bremer County, Iowa. It was built in 1995, so it is 30 years old, younger than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 97 vehicles a day, projected to reach 97 by 2043. The structure is 86 ft (26.2 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 250th ST over Quarter Section Run built?
It was built in 1995, making it 30 years old in 2025.
What condition is 250th ST over Quarter Section Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does 250th ST over Quarter Section Run carry?
About 97 vehicles per day (2022 count).
How long is 250th ST over Quarter Section Run?
The structure is 86 ft (26.2 m) long with a longest span of 21 ft (6.4 m) and a deck 25 ft wide.
Who owns 250th ST over Quarter Section Run?
It is owned by the County Highway Agency.