Moline RD over Trib Quarter Section Run
FairPosted for loadBlack Hawk County, Iowa · 90-12-07-02-10 · Structure no. 000000000076240
- Built
- 1956
- 69 years old
- Condition
- Fair
- inspected December 2022
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 31 ft
- 1 main span
- Daily traffic
- 49
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Moline RD over Trib Quarter Section Run is a steel stringer/multi-beam or girder carrying Moline RD over Trib Quarter Section Run in Black Hawk County, Iowa. It was built in 1956, so it is 69 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 49 vehicles a day, roughly 14% of them trucks, projected to reach 49 by 2043. The structure is 31 ft (9.4 m) long and 23 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Moline RD over Trib Quarter Section Run built?
It was built in 1956, making it 69 years old in 2025.
What condition is Moline RD over Trib Quarter Section Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2022.
How much traffic does Moline RD over Trib Quarter Section Run carry?
About 49 vehicles per day (2022 count), of which roughly 14% are trucks.
How long is Moline RD over Trib Quarter Section Run?
The structure is 31 ft (9.4 m) long with a longest span of 30 ft (9.1 m) and a deck 23 ft wide.
Who owns Moline RD over Trib Quarter Section Run?
It is owned by the County Highway Agency.