Ia 26 over Enterprise Creek
GoodAllamakee County, Iowa · 3.7 Mi. N of Jct. Ia. 9 · Structure no. 000000000013531
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 179 ft
- 3 main spans
- Daily traffic
- 1,540
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Ia 26 over Enterprise Creek is a prestressed concrete stringer/multi-beam or girder carrying Ia 26 over Enterprise Creek in Allamakee County, Iowa. It was built in 1995, so it is 30 years old, younger than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,540 vehicles a day, roughly 8% of them trucks, projected to reach 1,540 by 2044. The structure is 179 ft (54.6 m) long and 41 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ia 26 over Enterprise Creek built?
It was built in 1995, making it 30 years old in 2025.
What condition is Ia 26 over Enterprise Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Ia 26 over Enterprise Creek carry?
About 1,540 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is Ia 26 over Enterprise Creek?
The structure is 179 ft (54.6 m) long with a longest span of 68 ft (20.7 m) and a deck 41 ft wide.
Who owns Ia 26 over Enterprise Creek?
It is owned by the State Highway Agency.