US Bridges

Term 2-C Airport over Terminal 2-C

Fair

Honolulu County, Hawaii · Terminal 2-C · Structure no. 0032110314I0058

Built
1978
47 years old
Condition
Fair
inspected March 2024
Type
Tee Beam
Prestressed Concrete
Length
917 ft
11 main spans
Daily traffic
1,853
2018 count
Owner
State
State Highway Agency

About this bridge

Term 2-C Airport over Terminal 2-C is a prestressed concrete tee beam carrying Term 2-C Airport over Terminal 2-C in Honolulu County, Hawaii. It was built in 1978, so it is 47 years old, younger than the Hawaii average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,853 vehicles a day, roughly 3% of them trucks, projected to reach 3,045 by 2038. The structure is 917 ft (279.6 m) long and 101 ft wide.

CarriesTerm 2-C Airport
CrossesTerminal 2-C
LocationTerminal 2-C
StateHawaii
Coordinates21.3325, -157.9185
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating33.6 US tons
Inventory rating26.1 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans11 (+8 approach)
Design loadHS 20
Structure length917 ft (279.6 m)
Longest span50 ft (15.2 m)
Deck width101 ft (30.9 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deck17 ft (5.3 m)

Traffic and service

Average daily traffic1,853 (2018)
Projected traffic3,045 by 2038
Trucks3%
Lanes on structure6
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Term 2-C Airport over Terminal 2-C built?

It was built in 1978, making it 47 years old in 2025.

What condition is Term 2-C Airport over Terminal 2-C in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Term 2-C Airport over Terminal 2-C carry?

About 1,853 vehicles per day (2018 count), of which roughly 3% are trucks.

How long is Term 2-C Airport over Terminal 2-C?

The structure is 917 ft (279.6 m) long with a longest span of 50 ft (15.2 m) and a deck 101 ft wide.

Who owns Term 2-C Airport over Terminal 2-C?

It is owned by the State Highway Agency.