H3 over Quarry RD Halawa Strm
GoodHonolulu County, Hawaii · _ · Structure no. 003000H30200056
- Built
- 1991
- 34 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 2,858 ft
- 28 main spans
- Daily traffic
- 49,100
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
H3 over Quarry RD Halawa Strm is a prestressed concrete continuous stringer/multi-beam or girder carrying H3 over Quarry RD Halawa Strm in Honolulu County, Hawaii. It was built in 1991, so it is 34 years old, younger than the Hawaii average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 49,100 vehicles a day, roughly 5% of them trucks, projected to reach 54,950 by 2027. The structure is 2,858 ft (871.2 m) long and 82 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was H3 over Quarry RD Halawa Strm built?
It was built in 1991, making it 34 years old in 2025.
What condition is H3 over Quarry RD Halawa Strm in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does H3 over Quarry RD Halawa Strm carry?
About 49,100 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is H3 over Quarry RD Halawa Strm?
The structure is 2,858 ft (871.2 m) long with a longest span of 140 ft (42.7 m) and a deck 82 ft wide.
Who owns H3 over Quarry RD Halawa Strm?
It is owned by the State Highway Agency.